Kitchens only. Remodel planning for Holladay and the Salt Lake Valley, starting with the layout.

Kitchen remodeling service

Kitchen Design & 3D Planning in Holladay, UT walk the room before anything is ordered.

Kitchen design and 3D planning in Holladay lets you test a new layout on screen, with real measurements, before a single cabinet is ordered or a wall is opened. Tell us what isn't working and we'll connect you with a local kitchen remodeling professional.

  • Layout options measured against NKBA planning guidance
  • 3D views to check sight lines, storage and seating
  • Design, scope and selections tied to one buildable plan
Kitchen design and 3D planning on a laptop beside paint and stone samples, used to plan a Holladay kitchen layout before construction
Illustrative Layout model beside finish samples

Free · No obligation

Tell Us What Isn't Working

What kitchen design and 3D planning includes

Design is the part of a remodel where changing your mind is cheap. Moving a sink on a screen costs a few minutes; moving it after the drain is set costs a plumber, an inspection and a patched floor. A thorough design phase usually produces:

  • A field measure of the room, windows, doors, ceiling height and anything that can't move
  • Notes on existing conditions: the plumbing wall, the panel, ducts, and any soffits worth opening
  • Two or three layout options, compared on traffic, storage and work space
  • A 3D model showing the room from the doorway, the sink and the seating
  • Floor plan and wall elevations with cabinet sizes and appliance locations
  • An electrical and lighting plan: outlets, circuits, fixtures and switches
  • A selections list for cabinets, counters, flooring, fixtures and appliances
  • A written scope that a remodeler can price and a building department can review

The 3D model earns its keep where a flat floor plan can't help: how a tall pantry reads from the front door, whether an island blocks the view to the backyard, how the range hood lines up with the window. It also gives everyone in the household the same picture to react to, instead of five imagined kitchens.

Soffits deserve a special note in older homes. They can conceal ductwork, venting, plumbing or wiring, so a good designer has them inspected before promising cabinets to the ceiling.

Signs you need a design phase before construction

  • You can't picture it. You know the kitchen doesn't work, but not what would.
  • Your quotes don't match. Three remodelers priced three different kitchens because nobody wrote down one plan.
  • Something big might move. A wall, the sink, the range or a gas line. Those choices ripple into every trade.
  • Two people cook. Shared kitchens need wider aisles and separate zones, which have to be drawn to be checked.
  • The household disagrees. A 3D view settles arguments that a sketch on graph paper starts.

What a good kitchen design checks

Pretty renderings are easy. What matters is whether the plan works when people cook in it. The National Kitchen & Bath Association (NKBA) publishes planning guidelines that turn "does it feel right?" into measurements a design can be checked against.

Source: NKBA Kitchen Planning Guidelines, Guidelines 3, 6, 11, 13, 16, 17 and 25.
Design checkNKBA guidance
Work triangleSink, cooktop and refrigerator legs total 26 ft or less; each leg 4 to 9 ft
Work aisleAt least 42 in. for one cook, 48 in. for two or more
Sink landing area24 in. on one side, 18 in. on the other
Cooktop landing area12 in. on one side, 15 in. on the other
Refrigerator landing area15 in. on the handle side
DishwasherWithin 36 in. of the cleanup sink
Total countertop158 in. of frontage, 24 in. deep

NKBA's newer fourth-edition guidelines frame the same idea around activity centers and call for 48 to 52 inches of clearance at each one. A designer should tell you which standard they're working from, because the numbers differ.

Source: NKBA Kitchen & Bath Planning Guidelines, 4th ed. summary, section 1.6.

Ways to plan a kitchen, compared

Homeowners reach a design by different routes. Houzz's 2026 Kitchen Trends Study found 22% of renovating homeowners hire a kitchen designer and 34% hire a cabinetmaker, often alongside a general contractor.

Source: Houzz 2026 U.S. Kitchen Trends Study.

RouteWhat you getWatch out for
Online planner (DIY)A quick way to explore ideas and rough sizesNo field measure, no check of plumbing, wiring or structure
Cabinet showroom designDetailed cabinet layout and renderings tied to one product linePlans may stop at the cabinet boxes and skip lighting, electrical and flooring
Independent kitchen designerLayout options and selections, independent of who builds itThe remodeler still has to confirm the plan can be built for the budget
Remodeler-led design and 3DA plan priced and sequenced by the people who will build itAsk how many layout options and revisions are included

How a well-planned design phase runs

  1. Start with complaints, not picturesWhat doesn't work today: crowding, storage, light, seating, how you cook.
  2. Measure and investigateRoom dimensions, ceiling height, wall construction, plumbing and electrical locations.
  3. Compare layoutsTwo or three floor plans scored on aisles, landing areas, storage and traffic.
  4. Model it in 3DCheck views from the entry and family room, island proportions and how tall cabinets meet the ceiling.
  5. Detail the planElevations, cabinet list, lighting and outlet plan, appliance specs.
  6. Lock selections and scopeFinishes chosen to fit the plan, then a written scope ready for pricing and permits.

What drives the cost of design and planning

Design fees vary widely, and some remodelers fold them into the construction contract. What moves the price is the work involved, not the software:

  • How much changes. Rearranging cabinets inside the same footprint takes less drawing than moving walls or plumbing.
  • Investigation. Opening soffits, locating joists or bringing in a structural engineer for a wall.
  • Number of options and revisions. Ask up front what's included.
  • Drawing depth. A concept rendering is not the same as permit-ready plans and a full cabinet order.

The bigger cost question is what a weak design leads to later. In Houzz's 2026 renovation study, 37% of homeowners went over budget; of those, 31% blamed changes to scope or design and 32% said the project was more complex than expected. Time spent in design is how both get smaller.

Source: Houzz & Home 2026 Renovation Trends Study.

Kitchen design for Holladay homes

Kitchen design here starts from a known pattern. Nearly half of Holladay's homes went up in the 1950s and 1960s, when kitchens were usually planned as separate rooms. Design work in these houses tends to be about turning the plan toward the living space, finding room for a second cook, and deciding whether a wall between kitchen and dining room should stay.

Source: U.S. Census ACS 2020-2024, Holladay.

The design also feeds the permit. Holladay takes applications online through its iWorQ portal with a Building Permit Checklist, and the city aims to finish a first plan review within 7 business days. State law sets an outer limit: plan review for a single-family home must finish within 14 business days after the application clears screening. If the plan raises questions, the Building Official holds consultations by appointment on Mondays and Wednesdays, 3:30 to 5:00 pm.

Sources: City of Holladay FAQ; Holladay Building Division; Utah Code 10-20-909.

Why plan it this way

Why design comes first in a Holladay kitchen remodel

Holladay Kitchen Co. connects you with an independent local kitchen remodeling professional who treats the plan as the most important thing they hand you.

Measured, not guessed

A layout is judged by how people move through it: whether two cooks can pass, whether the dishwasher blocks the sink, whether groceries have somewhere to land. Drawing those clearances into the plan, and seeing them in 3D, catches the problems that renderings of finishes hide.

NKBA 4th ed.: 48 to 52 in. of clearance at each activity center. Section 1.6

One plan every trade builds from

The cabinet shop, fabricator, electrician and plumber should all work from the same drawings. When the design covers outlets, lighting, plumbing and flooring as well as cabinets, nobody has to guess where the pendant box goes or which side the dishwasher sits on.

22% of renovating homeowners hire a kitchen designer. Houzz 2026 Kitchen Trends

Decisions made on screen

Every choice settled during design is one less decision during demolition. Layout, cabinet sizes, appliance specs and finishes are agreed before construction, which is why planning takes longer than building in most kitchen remodels, and why that time is well spent.

Kitchens average 9.5 months of planning and 5.8 months of construction. Houzz & Home 2026

Before demo day

What a finished design puts in your hands

The point of design and 3D planning is to arrive at demo day with nothing left to guess: a proposed layout, written scope, selections and a sequence the whole project follows.

The planning-before-demolition checklist

  • Proposed layout

    A floor plan showing where the sink, range, refrigerator, island and storage go, with aisle and seating clearances checked.

  • Written project scope

    What is included and what isn't: walls, plumbing moves, electrical, flooring, patching and finish work.

  • Material and finish selections

    Cabinets, counters, flooring, fixtures and lighting chosen, so nothing stalls while you shop mid-project.

  • Project sequence

    The order of demolition, rough-in, inspections, cabinets, templating, counters and finishes.

  • Expected schedule

    Realistic dates for permits, lead times and each phase, including how long you'll be without a kitchen.

  • Major decisions resolved

    Wall removal, appliance specs, sink location and budget priorities decided before the first cabinet comes out.

Questions

Kitchen design and 3D planning FAQ

Is a 3D rendering the same as construction drawings?

No. A 3D rendering shows what the room will look like. Construction drawings show dimensions, cabinet sizes, outlet and fixture locations and anything structural. A complete design phase should produce both, or make clear which one you're getting.

Can I use a design I already have?

Yes. A plan from an independent designer or a cabinet showroom is a good starting point. Expect the remodeler to field-verify the measurements and check it for plumbing, electrical and structural issues before pricing it.

How many layout options should I see?

Two or three genuinely different options is a useful range. Each should be compared on aisle widths, landing space, storage and traffic, not only on looks, so you can see what each one gives up.

Which planning standard should my designer use?

Most designers reference the National Kitchen & Bath Association guidelines. The older guidelines use 42-inch work aisles for one cook and 48 inches for two; the fourth edition calls for 48 to 52 inches at activity centers. Ask which one your plan follows. Building code still governs things like outlets and ventilation.

How long does kitchen design take?

It depends on how much changes and how quickly decisions get made. Houzz's 2026 renovation study found kitchen projects average 9.5 months of planning overall, which includes deciding, designing, pricing and permitting.

Better layouts. Better living.

Want to see the plan before you commit?

Tell us what isn't working in your kitchen. The design conversation starts with the problems, and the finishes follow the plan.

or call (385) 895-9892