Kitchens only. Remodel planning for Holladay and the Salt Lake Valley, starting with the layout.

Kitchen remodeling service

Kitchen Layout Reconfiguration in Holladay, UT same room, better arrangement.

Kitchen layout reconfiguration in Holladay means moving the sink, range, refrigerator and counters so the room works the way you actually cook. Tell us what isn't working and we'll connect you with a local kitchen remodeling professional.

  • Work triangle, zones and aisles checked against NKBA guidance
  • Landing space beside every sink, cooktop and refrigerator
  • Plumbing and electrical moves planned with the cabinets
Kitchen layout reconfiguration in a Holladay home: a former galley turned into a U-shaped kitchen with the sink moved under the window
Illustrative Former galley reworked into a U, sink under the window

Free · No obligation

Tell Us What Isn't Working

What kitchen layout reconfiguration includes

Reconfiguring a kitchen layout keeps the room but changes how it is arranged. The sink might move to the window, the range might shift off the main walkway, the refrigerator might trade places with a pantry cabinet. Every one of those moves pulls plumbing, wiring, venting and cabinetry along with it. A complete reconfiguration project usually covers:

  • Measuring the room, door swings, windows and the paths people walk through it
  • Mapping today's work zones and where they break down
  • Relocating the sink, dishwasher, range, refrigerator or wall oven
  • New drain, vent and supply routes for a moved sink or dishwasher
  • New circuits and outlets for relocated appliances and counters
  • Range hood ducting to the new cooking location
  • A cabinet and countertop plan built around the new arrangement
  • Floor and wall repair where fixtures and cabinets used to be

Signs the layout is the problem, not the finishes

Plenty of dated kitchens function fine and just need new surfaces. These are the signs that the arrangement itself is failing:

  • You walk too far, or not far enough. The refrigerator is across the room from the sink, or the range is jammed right against it.
  • There's nowhere to set things down beside the refrigerator, sink or cooktop.
  • Traffic cuts through the cooking area. Kids heading to the back door pass between the stove and the sink.
  • Appliance doors fight each other. The dishwasher blocks the sink, or the oven and refrigerator doors can't open at once.
  • A tall cabinet or refrigerator splits the counter, leaving two short runs that are too small to prep on.

The work triangle and work zones

Two ideas guide most layout decisions. The first is the classic work triangle connecting the cooking surface, the cleanup sink and the refrigerator. The second, emphasized in NKBA's newer fourth-edition guidelines, plans around activity centers, or zones, for prep, cooking, cleanup and storage. Both aim at the same thing: short, clear paths and room to work.

Source: NKBA Kitchen Planning Guidelines, Guidelines 3, 5, 10, 11, 12, 16 and 17.
Planning pointNKBA guidance
Work triangle totalNo more than 26 ft. for the three legs combined
Each triangle legBetween 4 ft. and 9 ft., measured from the center-front of each appliance or sink
TrafficNo major traffic pattern should cross through the triangle
Single sinkAdjacent to or across from the cooking surface and refrigerator
Sink landing area24 in. on one side, 18 in. on the other
Primary prep area36 in. wide by 24 in. deep of continuous counter next to a sink
Refrigerator landing15 in. on the handle side, or across within 48 in.
Cooking surface landing12 in. on one side, 15 in. on the other

The fourth edition also sets a work zone clearance at activity centers of 48 to 52 inches, a little more generous than the older 42-inch, one-cook aisle. When a plan cites a clearance, ask which NKBA document it comes from.

Source: NKBA Kitchen & Bath Planning Guidelines, 4th ed. summary, Section 1.6.

Common reconfigurations compared

ChangeWhat it solvesWhat it involves
Galley to U-shapeAdds a third counter run and corner storage; ends through-traffic if one end closesClosing a doorway or relocating an entry; NKBA's access standard plans 60 in. between opposing arms
Galley or U to L with islandOpens the kitchen to the next room and adds seatingUsually a wall removal; island aisles of 42 to 48 in.
Sink to the windowDaylight and a view at the cleanup zoneNew drain and vent route; dishwasher moves with it
Range off the walkwayKeeps traffic away from hot pansNew hood duct route; gas line or a dedicated range circuit
Refrigerator to the end of a runStops a tall unit from splitting the counterNew outlet, possibly a water line for the ice maker

Two details are easy to miss when appliances move. NKBA places the dishwasher's nearest edge within 36 inches of the cleanup sink, with at least 21 inches of standing space beside it, and it warns against a full-height obstacle such as a tall pantry or refrigerator separating two primary work centers.

Source: NKBA Kitchen Planning Guidelines, Guidelines 4 and 13; access standard for U-shaped kitchens.

How a well-planned reconfiguration runs

  1. Watch how the kitchen is usedWho cooks, how many people are in the room at once, where groceries come in and where the kids cut through.
  2. Sketch two or three arrangementsCompare them against triangle distances, landing areas and aisle widths before picking one.
  3. Check what's behind the wallsDrain locations, vent paths, the electrical panel and any soffits that may hide ductwork, plumbing or wiring.
  4. Lock the appliance listExact models set cutout sizes, circuit needs and hood duct size.
  5. Design cabinets and counters to the planFinishes come last, once every fixture has a fixed address.
  6. Permits, rough-in, inspection, buildPlumbing and electrical are roughed in and inspected before walls close and cabinets go in.

What drives the cost of a layout change

Moving things is what costs money, and some things move more easily than others:

  • The sink. Usually the biggest swing, because the drain needs slope and the vent needs a legal path.
  • Gas. Relocating a gas range means new gas piping, done by a certified or licensed installer.
  • Ventilation. A new range location needs a new duct route to the outside.
  • Electrical. New circuits, outlets every few feet along new counters, and possibly panel capacity.
  • Cabinets and counters. A new arrangement usually means new cabinet boxes rather than reused ones.
  • Floor and wall repair where old cabinets and fixtures came out.

A full reconfiguration is generally a major remodel. Zonda's 2025 Cost vs. Value report puts a midrange major kitchen remodel in the Mountain region at $81,538, recouping 49.3% at resale. The Houzz 2026 Kitchen Trends Study, which defines a major remodel as replacing at least all cabinets and appliances, reports a $55,000 median spend.

Sources: Zonda Cost vs. Value 2025, Mountain region; Houzz 2026 U.S. Kitchen Trends Study.

Layout changes in Holladay homes

More than 47% of Holladay homes were built in the 1950s and 1960s, with the 1960s alone accounting for 24.2%. Kitchens from those decades were often laid out for one cook, with the refrigerator, range and sink lined up along a wall or squeezed into a galley. Reconfiguring that footprint is often enough to fix the workflow without adding square footage.

Moving fixtures triggers permits. Holladay's Building Division lists plumbing work (including gas lines, drain-waste-vent piping and water lines) and new electrical circuits as permit items, while replacing a fixture with an equivalent one is exempt. A sink that moves to a new wall is no longer a like-for-like swap, so check with the city. The division says it strives to complete the first plan review within 7 business days.

Sources: U.S. Census ACS 2020-2024, Holladay; Holladay Building Division FAQ.

Why plan it this way

Why reconfiguration is where better kitchens begin

Holladay Kitchen Co. connects you with an independent local kitchen remodeling professional who works out where everything goes before anything is ordered.

Distances before door styles

The steps between the refrigerator, sink and range get walked every single day. Getting those distances right does more for daily cooking than any countertop color. The arrangement is fixed first, and the finishes are chosen to suit it.

NKBA: work triangle legs of 4 to 9 ft., totaling no more than 26 ft. Guideline 3

Every move, one plan

A relocated sink involves a plumber, an electrician for the disposer and dishwasher, a cabinet layout and a countertop cutout. When those trades work from separate ideas, the drain ends up in the wrong cabinet. One coordinated plan keeps them aligned.

87% of renovating homeowners hire at least one professional for a kitchen. Houzz 2026 Kitchen Trends

The plan holds after demo

Second-guessing where the range goes once the floor is open means new rough-in, new inspections and new cabinet orders. Settling the arrangement on paper, with real appliance specs, keeps the project from changing direction halfway through.

Change orders inflate a renovation budget by an average of 10%. Consumer Reports

Before demo day

What you have in hand before the layout changes

A new arrangement touches every trade, so each fixture's new location, the appliance specs and the rough-in plan should be settled before the old kitchen comes out.

The planning-before-demolition checklist

  • Proposed layout

    A floor plan showing where the sink, range, refrigerator, island and storage go, with aisle and seating clearances checked.

  • Written project scope

    What is included and what isn't: walls, plumbing moves, electrical, flooring, patching and finish work.

  • Material and finish selections

    Cabinets, counters, flooring, fixtures and lighting chosen, so nothing stalls while you shop mid-project.

  • Project sequence

    The order of demolition, rough-in, inspections, cabinets, templating, counters and finishes.

  • Expected schedule

    Realistic dates for permits, lead times and each phase, including how long you'll be without a kitchen.

  • Major decisions resolved

    Wall removal, appliance specs, sink location and budget priorities decided before the first cabinet comes out.

Questions

Kitchen layout reconfiguration FAQ

Does the kitchen work triangle still matter?

It's still a useful check. NKBA guidance keeps each leg between 4 and 9 feet and the total under 26 feet. NKBA's fourth edition adds zone-based planning around activity centers, which suits kitchens where more than one person cooks.

Can I move my kitchen sink to a different wall?

Usually, yes. The main question is whether the new location can get a drain with proper slope and a vent route. That's settled by looking at the floor framing and the existing plumbing during planning. New drain, vent and water line work falls under Holladay's plumbing permit items, so confirm with the city.

How much counter space should be next to the sink and the range?

NKBA recommends 24 inches on one side of the sink and 18 inches on the other, and 12 inches on one side of a cooking surface with 15 inches on the other. A continuous prep area of 36 by 24 inches next to a sink is also recommended.

Can a galley kitchen be turned into a U-shape?

Often, if one end of the galley can be closed off or an entry relocated. For a U-shaped kitchen, NKBA's access standard plans 60 inches between the opposing arms, so the room's width decides how deep the counters can be.

Where should the dishwasher go when the sink moves?

With it. NKBA places the nearest edge of the dishwasher within 36 inches of the cleanup sink, and asks for at least 21 inches of standing space between the dishwasher and any cabinets or appliances set at a right angle to it.

Better layouts. Better living.

Ready for a kitchen that flows?

Tell us what isn't working in your current layout. The arrangement gets solved first, and the finishes follow the plan.

or call (385) 895-9892