Key points
- Kitchen construction averaged 5.8 months in the Houzz & Home 2026 study, the longest of any room.
- EPA's lead-safe rules for homes built before 1978 require containment, HEPA-controlled tools and verified cleanup.
- Firms must give you EPA's Renovate Right pamphlet before lead-regulated work begins.
- In Utah, a hired contractor generally needs a certified asbestos inspection first; owners doing their own work are treated differently.
- A temporary kitchen, a sealed work zone and clear house rules for kids and pets make the months far easier.
What to expect when living through a kitchen remodel
The Houzz & Home 2026 study found kitchens have the longest timelines of any room, averaging 5.8 months of construction on 2025 projects. That average includes everything from cosmetic updates to full gut remodels, so your own schedule may be shorter or longer, but it's a fair warning that this is a season, not a weekend.
Source: Houzz 2026 U.S. Houzz & Home Renovation Trends Study.
The household experience changes as the project moves along. Demolition and rough-in are the loudest and dustiest stretch, and the time when water, power or gas to the kitchen may be off. Drywall sanding brings a second wave of fine dust. Once cabinets go in, the noise drops, and the last weeks are mostly waiting on counters, fixtures and the final inspection. The kitchen remodel timeline guide covers the phases in order.
The single best way to shorten the hard part is to finish decisions before demo. Every choice made on paper is one fewer pause while the kitchen is torn apart. See planning before demolition.
Dust containment: what good practice looks like
The most authoritative guide to keeping construction dust out of the rest of the house is EPA's list of required work practices under its lead Renovation, Repair and Painting (RRP) rule. Even where lead isn't the issue, these practices describe what a careful job looks like. They require:
- "Work-area containment to prevent dust and debris from leaving the work area"
- No "open-flame burning" and no "power tools without High Efficiency Particulate Air (HEPA) exhaust control"
- "Thorough clean up followed by a verification procedure"
Source: EPA, RRP Program work practices (updated December 2025).
In practice, that means plastic sheeting sealing doorways and openings, a single controlled entry for the crew, floor protection along the path in and out, and HEPA vacuums for cleanup. EPA's Renovate Right pamphlet also tells residents to stay out of the work area and says ducts should be closed and covered with plastic, which matters in houses where an HVAC return sits near the kitchen.
Ask your remodeler how containment will work before you sign. A good answer is specific: which doorways get sealed, where the crew enters, how vents are covered and how cleanup is checked at the end of each day.
Lead paint in pre-1978 homes
EPA's RRP rule applies to "homes, child care facilities, and kindergartens built before 1978." Firms that disturb lead-based paint in those homes must be "EPA- or state-certified," and they must give owners the Renovate Right pamphlet before work begins. EPA "recommends homeowners hire lead-safe certified contractors for all RRP projects in pre-1978 homes," and you can look up certified firms with EPA's firm locator.
Sources: EPA, RRP Program Rules; EPA, RRP information for do-it-yourselfers.
In Utah, the DEQ Division of Air Quality's Lead-Based Paint Program oversees the certification of individuals and firms doing this work, and publishes a list of certified firms. That's relevant here: roughly two-thirds or more of Holladay's housing units were built before 1980, so many local kitchens fall under the rule. Note that the rule generally doesn't apply to owners working on their own home, but EPA's lead-safe practices are still the right model if you do any of the work yourself.
Sources: Utah DEQ, Lead-Based Paint Program; U.S. Census ACS 2020-2024 5-year, Holladay.
Asbestos: who has to inspect, and when
EPA lists "floor and ceiling tiles, pipe wraps, insulation" among the places asbestos may be found, recommends a trained, accredited inspector before remodeling, and suggests leaving material that's in good condition alone. Utah DEQ adds popcorn ceilings, vinyl tiles, duct and boiler wrap, and sheetrock to the list of household sources.
Sources: EPA, Protect your family from exposures to asbestos; Utah DEQ, asbestos in the home.
| Who does the work | What Utah's asbestos rules say |
|---|---|
| A hired contractor | Inspection by a state-certified inspector before renovation; asbestos-containing materials "must be removed by a certified asbestos-removal contractor before being disturbed." |
| An owner-occupant doing the work | Exempt from the inspection requirement, though "Contractors for hireā¦are required to follow the inspection provisions." |
Being exempt from an inspection doesn't make old materials safe to tear out. If you plan to do any demolition yourself, it's still worth having suspect materials tested first. Utah's thresholds for which homes need a full inspection have been under revision, so confirm the current rules for your home's age with Utah DEQ's asbestos program. For more on older houses, see remodeling older Holladay kitchens.
Questions to ask before work starts
Living through a kitchen remodel goes better when the house rules are agreed in advance. Most renovators work with professionals: the Houzz 2026 Kitchen Trends Study found 87% of kitchen renovators hire at least one. That makes the pre-construction conversation the right moment to ask:
- How will the work area be sealed, and how will HVAC vents near the kitchen be handled?
- Is the firm lead-safe certified if the home was built before 1978? (You can check EPA's firm locator or Utah DEQ's list.)
- Has an asbestos inspection been scheduled, and what happens if it finds something?
- When will water, power or gas to the kitchen be shut off, and for how long?
- What are the working hours, and which entrance will the crew use?
- How is the site left at the end of each day?
Source: Houzz 2026 U.S. Kitchen Trends Study.
Setting up a temporary kitchen
No government agency publishes a standard for this, so treat what follows as practical, general advice. The goal is a small station that handles breakfast, simple dinners and cleanup without the main kitchen.
- Pick the spot. A dining room, laundry room or basement corner with outlets on more than one circuit and, ideally, a nearby sink.
- Keep the refrigerator running. Ask whether yours can move to the temporary space or the garage during demolition.
- Choose a few appliances. A microwave, a toaster oven or countertop cooker, an electric kettle and a coffee maker cover most meals. Don't overload a single circuit.
- Plan for dishes. A laundry or bathroom sink with a dish tub works; some households switch to reusable camping-style plates to cut washing.
- Pack a "keep out" box. One pot, one pan, a knife, a cutting board and basic utensils, kept out of the moving boxes.
- Lean on the grill. In warmer months, outdoor cooking takes pressure off the indoor setup.
Safety with kids and pets
A kitchen under construction has open walls, live wiring during rough-in, tools, nails and dust. Again, this is general guidance rather than a published standard:
- Treat the work zone as off limits, consistent with Renovate Right's advice that residents stay out of the work area. A door that closes or a sealed plastic barrier helps.
- Agree with your remodeler on how the site is left at the end of each day: tools put away, debris cleared, openings covered.
- Keep pets in a separate part of the house during work hours. Open exterior doors and loud noise can send them running.
- Clean shared floors near the work area with a damp mop or HEPA vacuum rather than a broom, so small children and pets aren't crawling through dust.
- If someone in the house is pregnant, or young children live there, raise lead safety with your remodeler before work starts in a pre-1978 home.
Most of these questions are easier to answer during planning than on demo day. The planning-before-demolition checklist includes getting the house ready.
Sources
- Houzz, 2026 U.S. Houzz & Home Renovation Trends Study
- EPA, RRP Program work practices
- EPA, Renovate Right
- EPA, RRP Program Rules
- EPA, RRP information for do-it-yourselfers
- EPA, lead-safe certified firm locator
- Utah DEQ, Lead-Based Paint Program
- U.S. Census Bureau, ACS 2020-2024 5-year, Holladay
- EPA, Protect your family from exposures to asbestos
- Utah DEQ, asbestos in the home
- Utah Admin. Code R307-801-2 (Cornell LII)
- Utah DEQ, Asbestos Program
- Houzz, 2026 U.S. Kitchen Trends Study