Kitchens only. Remodel planning for Holladay and the Salt Lake Valley, starting with the layout.

Kitchen remodeling service

Kitchen Flooring in Holladay, UT chosen for spills, sequenced with the cabinets.

Kitchen flooring in Holladay has to handle water, dropped pans and heavy traffic, and it has to be installed in the right order with the cabinets. Tell us what isn't working and we'll connect you with a local kitchen remodeling professional.

  • LVP, tile and wood compared for a working kitchen
  • Under-cabinet or around-cabinet decided in the plan
  • Old flooring tested before it's torn out
Kitchen flooring in a Holladay home: wide-plank oak-look luxury vinyl running continuously from the kitchen into the dining area
Illustrative Plank floor running into the dining area

Free · No obligation

Tell Us What Isn't Working

What a kitchen flooring project includes

The floor is the one surface that runs under or around everything else in the kitchen, and usually into the rooms beside it. Getting it right is as much about sequence and subfloor as about the product. A complete kitchen flooring scope covers:

  • Testing old flooring and adhesive before removal in older homes
  • Tearing out existing layers down to a sound subfloor
  • Repairing, flattening or adding underlayment to the subfloor
  • Choosing a product that suits spills, traffic and the rest of the house
  • Deciding whether the floor runs under the cabinets or stops at them
  • Transitions to the dining room, hall and family room
  • Appliance openings, toe kicks, baseboard and trim

Signs your kitchen floor needs replacing

  • It's patched around an old layout. Removing a peninsula or wall leaves a gap the old floor can't fill.
  • Layers have piled up. Vinyl over vinyl over tile raises the floor until the dishwasher barely fits.
  • The subfloor moves. Soft spots near the sink or dishwasher can point to old leaks.
  • It doesn't connect. The kitchen has one floor, the dining room another and the hall a third, and opening the plan will show every seam.
  • It's worn through. Peeling seams, cracked tiles or a finish that won't clean up.

LVP vs. tile vs. engineered or solid wood

FloorStrengths in a kitchenWhat to check
Luxury vinyl plank (LVP)Comfortable underfoot, handles spills, easy to run into adjoining roomsWear layer: 6 to 12 mil is rated for light residential use, 12 to 20 mil for active households
Porcelain or ceramic tileVery hard-wearing, water does no harm to the tile itselfGlazed tile is classed 0 to 5 for abrasion under ASTM C1027; the test may understate wear on dark tiles
Engineered woodReal wood look and feel, more dimensionally stable than solid woodWear layer thickness decides whether it can be refinished
Solid hardwoodCan be refinished; matches existing wood floors in the houseMost sensitive to humidity swings and standing water

Sources: MSI Surfaces, LVT wear layers (2026); TCNA, tile abrasion (ASTM C1027); NWFA Installation Guidelines, Appendix H.

A note on the "PEI rating" you'll see on tile boxes: the Tile Council's lab says the correct name is visible abrasion classification, and it applies only to glazed tile. For engineered wood, NWFA's refinishable program sets a minimum wear layer of 3/32 inch (2.5 mm) for factory-finished smooth boards. Claims that a product is "waterproof" have no common standard behind them, so read the specific warranty. NKBA also recommends slip-resistant kitchen flooring, which is worth asking about on any glossy finish.

Sources: Floor Covering News on NWFA, Jan 2023; NKBA 4th ed. summary, section 1.3.

Under the cabinets or around them?

This is the decision people forget to make until the installer asks. For floating floors, which include most click-together LVP and some engineered wood, the answer is set by the manufacturer: install the cabinets and island first, then float the floor around them. Urban Surfaces is blunt about it: "Never install cabinets on top of floating flooring," because the floor needs to expand and contract. Leave a 1/4-inch gap and cover it with quarter-round.

Source: Urban Surfaces KB05-008.

Tile and glued or nailed floors can go either way. Running them under the cabinets uses more material but makes a future layout change easier and keeps the dishwasher opening at the same height as the floor around it. Stopping at the cabinets saves material. Either way, the choice belongs in the written scope so the cabinet installer and flooring installer agree on who goes first.

In an open plan, also decide where the floor stops. Running one product from the kitchen through the dining and family rooms makes the space read as one room, but it widens the scope and may need transition or expansion breaks at doorways; check the manufacturer's limits on continuous runs before committing.

How a well-planned flooring project runs

  1. Test what's thereIn older homes, sample old vinyl, tile and adhesive before anyone pulls it up.
  2. Choose the floor with the layoutPick a product and decide under or around the cabinets, and how far it runs into other rooms.
  3. Remove and prepareStrip to the subfloor, repair water damage, flatten and add underlayment.
  4. Acclimate as the maker saysWood and some vinyl products specify conditions before installation.
  5. Install in the agreed orderBefore or after cabinets, depending on the product and plan.
  6. Trim and transitionsBaseboard, quarter-round and thresholds into the next rooms.

What drives kitchen flooring cost

  • Square footage beyond the kitchen. Open plans often mean flooring the dining and family rooms too, so the floor reads as one surface.
  • Removal and testing. Asbestos sampling and, if needed, abatement by a certified company.
  • Subfloor work. Leveling, water-damage repair and underlayment.
  • Product. Wear layer, tile size and format, wood species and thickness.
  • Pattern and layout. Large-format tile, herringbone and diagonal layouts add labor and waste.

For context on the bigger budget, flooring is part of nearly every minor and major remodel. Houzz's 2026 Kitchen Trends Study puts the median minor kitchen remodel at $20,000. The kitchen flooring options guide compares materials in more depth.

Source: Houzz 2026 U.S. Kitchen Trends Study.

Kitchen flooring in Holladay homes and Utah's dry air

Two local factors shape flooring here: the age of the floor you're removing and the climate the new one has to live in.

Most Holladay homes predate 1981; the Census puts 68.8% before 1980. Under Utah's asbestos rule, contractors must have a certified inspection before renovating. Older homes get a full inspection, and even for homes built after 1981 the rule names vinyl tile, sheet vinyl, flooring backing and mastic as materials to check. A kitchen tear-out is one of the most common places those layers turn up.

Sources: U.S. Census ACS 2020-2024, Holladay; Utah Admin. Code R307-801-9; R307-801-10.

Then there's the air. NOAA normals put Salt Lake City's average outdoor afternoon humidity at 22% in July. That's outdoor air, not your kitchen, but it's a reason to check indoor conditions before choosing wood. The NWFA recommends keeping wood floors at 60 to 80°F and 30 to 50% relative humidity. Engineered boards and narrower widths move less than wide solid planks, and NWFA notes radiant heat is dry heat that may call for a humidifier. A hygrometer in the kitchen for a few weeks answers the question cheaply.

Sources: NOAA 1961-1990 normals via Current Results; Hardwood Floors Magazine on NWFA guidance, 2023; NWFA Appendix H.

Why plan it this way

Why kitchen flooring is planned with the layout

Holladay Kitchen Co. connects you with an independent local kitchen remodeling professional who decides the floor alongside the cabinets, not after them.

The floor follows the footprint

Where the cabinets and island sit decides where the floor shows, where it must run continuously, and whether a floating floor can be used at all. Deciding the layout first means the product, the sequence and the transitions into other rooms all fit the plan.

Floating floors need a 1/4 in. expansion gap at fixed cabinets. Urban Surfaces

Cabinet and floor installers on one schedule

The cabinet installer and flooring installer each need to know who goes first, how high the dishwasher opening ends up and where the floor stops. Treated as one complete kitchen, those hand-offs are written down instead of argued about on site.

NWFA: keep wood floors at 30 to 50% relative humidity. Hardwood Floors Magazine

Tested before it's torn out

In older Holladay kitchens, what's under the current floor matters as much as what goes on top. Asbestos testing, subfloor checks and the removal plan belong before demo day, so a surprise layer of old tile doesn't stop the job halfway.

68.8% of Holladay homes were built before 1980. U.S. Census ACS

Before demo day

What you have in hand before the old floor comes up

The floor touches cabinets, appliances and the rooms next door, so product, sequence, testing and transitions are settled before demolition begins.

The planning-before-demolition checklist

  • Proposed layout

    A floor plan showing where the sink, range, refrigerator, island and storage go, with aisle and seating clearances checked.

  • Written project scope

    What is included and what isn't: walls, plumbing moves, electrical, flooring, patching and finish work.

  • Material and finish selections

    Cabinets, counters, flooring, fixtures and lighting chosen, so nothing stalls while you shop mid-project.

  • Project sequence

    The order of demolition, rough-in, inspections, cabinets, templating, counters and finishes.

  • Expected schedule

    Realistic dates for permits, lead times and each phase, including how long you'll be without a kitchen.

  • Major decisions resolved

    Wall removal, appliance specs, sink location and budget priorities decided before the first cabinet comes out.

Questions

Kitchen flooring FAQ

Should kitchen flooring go under the cabinets?

It depends on the floor. Floating floors, including most click-together LVP, should never go under cabinets; they're installed after, with an expansion gap. Tile and glued or nailed floors can run under the cabinets, which makes future layout changes easier.

What LVP wear layer is right for a kitchen?

For a busy family kitchen, look at the 12 to 20 mil range, which MSI describes as suited to active residential use. Thinner 6 to 12 mil layers are rated for light residential use.

Can hardwood work in a Utah kitchen?

Yes, with care. The NWFA recommends keeping wood floors at 30 to 50% relative humidity and 60 to 80°F. In a dry climate that may mean running a humidifier in winter. Engineered wood is more dimensionally stable than solid, which makes it the safer wood choice for many kitchens.

Does my old kitchen floor need asbestos testing?

If a contractor is doing the work, Utah requires a certified asbestos inspection before renovation, and old vinyl tile, sheet vinyl and mastic are common items checked. Homeowners doing their own work are treated differently, but testing is still sensible in an older home.

Is a tile "PEI rating" reliable?

It's useful but limited. The correct name is visible abrasion classification under ASTM C1027, it applies only to glazed tile, and the Tile Council notes it may not predict real wear well, especially on dark tiles.

Better layouts. Better living.

Planning a new kitchen floor?

Tell us what isn't working underfoot. The layout decides where the floor runs, and the product follows the plan.

or call (385) 895-9892